Skip to content

Applications

Smart 40 kWp photovoltaic revamping and expansion

Context and challenge

An agricultural company characterized by high energy consumption — related to irrigation pumps, heated greenhouses, misting systems, lighting and other machinery — already had a photovoltaic system installed by QUAD. Although the system had proven reliable over the years, it had become technologically outdated. The previously installed modules and inverters could no longer fully exploit the site’s potential, resulting in lower overall performance and complex operational management.

Solution

QUAD IMPIANTI supported the client in improving the overall efficiency of its photovoltaic system, reducing waste and simplifying day-to-day management. The project involved revamping an existing 20 kWp system through the installation of high-efficiency modules and next-generation inverters. The upgrade freed up useful space for a second 20 kWp system, equipped with optimized cabling, energy storage systems and charging stations, without occupying additional surface area. Excess energy is stored to ensure continuity during night-time hours, increasing annual production by up to 30% and improving overall performance through advanced monitoring systems.

The Quad Quid

#INNOVATIVERELIABILITY

renewed system with modern technologies for stable performance

#SIMPLIFIEDMANAGEMENT

advanced monitoring and integrated storage for easier, continuous day-to-day management

More success stories

All Electrical Photovoltaic Residential Security Automation Full service Industry
ALL STORIES
Back To Top