Skip to content

Applications

Smart 690 kWp photovoltaic system

Context and challenge

An industrial company with several buildings needed to reduce energy costs without interrupting production. The challenge stemmed from the large roof area, consumption distributed across production, logistics and offices, and the integration of the photovoltaic system with existing systems. It was essential to ensure energy efficiency, centralized monitoring and a measurable reduction in costs.

Solution

QUAD IMPIANTI installed a 680 kWp smart photovoltaic system with string optimizers, designed to maximize self-consumption and reduce losses caused by partial roof shading, taking into account the climatic conditions and the configuration of the facility located in a mountain valley. Integrated with the grid and centralized monitoring systems, the system enables precise performance control, simplifies maintenance activities and allows remote supervision, making it possible to quickly identify anomalies and manage production and consumption flows in real time without interfering with operational continuity. The solution reduced electricity costs by approximately 10%, generating measurable economic and environmental benefits.

The Quad Quid

#WORRYFREEEFFICIENCY

system optimized to maximize self-consumption and limit shading-related losses.

#OPERATIONALCONTINUITY

integration with the grid and existing systems with centralized monitoring, without interrupting production

Applications

More success stories

All Electrical Photovoltaic Residential Security Automation Full service Industry
ALL STORIES
Back To Top